Return To Project List

Shaw Cationic System

Contact Number-Award Date
130103-02/25/2013

Owner/Location
Shaw Industries
Dalton, GA

Start Date-Completion Date
02/05/2013-02/20/2013

Contract Amount
$123,774

General Contractor
A. West Enterprise
Project Manager: Lavon Davis
Job Supervisor: Ryan Weathersby

Project Description

          This job consisted of providing power to the new cationic blending system. We provided power to twenty four (24) pieces of equipment in the warehouse, pump room, and blender platform. We swapped feeds on two breakers in the warehouse substation. We replaced an 800 amp panel with a 1200 amp panel and re-pulled the feeders. We removed the electrical feed and data from the warehouse office and reconnected it once it had been relocated. We provided air to the six box tilters and water to the two dryers. We ran 3,350 feet of aluminum rigid conduit and pulled 14,230 feet of wire.

client shaw