FDOT Site Lighting


Primary Contractor: VA Paving Inc
Owner: State of Florida
Location: Cape Canaveral, FL

Cost:
$147,794.90

Start Date:
June 2020
End Date:
October 2020

Print this Page

Project Description:
Highway Site Lighting Project per the FDOT Standards. Install 16 new precast concrete foundation for site lighting. Relocate 10 existing 27-30ft poles and fixtures to the new precast concrete foundations. In addition, provide 6 new 20ft poles and fixtures on new foundations. Install approximately 700ft of pvc conduit in open cut trench and 100ft of bore conduit.