First Baptist Church of Colquitt Electrical Upgrades


Primary Contractor:
Construction CGM
174 Thompson Town Road
Colquitt, GA 39837
Owner: First Baptist Church of Colquitt
Location: Colquitt, GA

Contract #:
No Project #
AWE 100106

A. West Project Manager:
Lavon Davis

Cost:
$283,818

Start Date:
March 2010

End Date:
February 2011
  • Project Description:
    The scope of this project consisted of the design/engineering cost, material cost, and labor cost for the following building specifications: • 480/277V 3 Phase 1600 amp service with associated sub panels and disconnects • Lighting: (ceiling heights – Sanctuary 32 ft. center height and classroom/corridors 10 ft. height) (Dimming control panel located in sound booth for sanctuary lighting) • Audible fire alarm system to code • Raceway for the relocation of the existing theatrical lighting and sound/video system (existing equipment was utilized) • Raceway between the sound booth and pulpit for communication/power • Raceway between the main electrical room and sound booth for future power/communication growth

Download Printable PDF