Florida A&M University Campus Wide Electrical Upgrades - Phase 3


Primary Contractor:
A. West Enterprise
705 Canal Street
Albany, GA 31707
Owner: Florida A&M University
Location: Tallahassee, FL
Contract #:
FAMU-BR322
AWE 100204

A. West Project Manager:
Jeremy Meads

Cost:
$8,469,243

Start Date:
April 21, 2010

End Date:
December 20, 2012

  • Project Description:
    The scope of this project consisted of a 15kV medium voltage distribution system including a new south campus substation building with medium voltage switchgear, a new concrete encased duct bank, directional boring, primary cable, manholes, switch vaults, transformers, switches, sectionalizing cabinets, and cable splicing and testing. In addition, 700 lighting fixtures throughout the campus were installed.

Download Printable PDF