Florida A&M University Steam Decentralization Project


Primary Contractor:
Siemens
119 Hamilton Park Dr., #6
Tallahassee, FL 32304
Owner: Florida A&M University
Location: Tallahassee, FL
Contract #:
Project # 11060
AWE 130102

A. West Project Manager:
Lavon Davis

Cost:
$215,200

Start Date:
January 28, 2013

End Date:
July 28, 2013

  • Project Description:
    The scope of this project consisted of providing power to eight boiler skids throughout the campus. Power was obtained from existing electrical services. There were 9,749 ft. of conduit installed, 31,896 ft. of wire pulled, 11 devices installed, six transformers set, three variable frequency drives installed, nine panels installed, and 18 lights installed. As well as a fire alarm installed to the new building additions.