Marine Corps Logistics Base Circuits 30 and 40 Replacement Project


Primary Contractor:
Power Secure
1609 Heritage Commerce Ct.
Wake Forest, NC 27587
Owner: Department of the Navy
Location: MCLB, Albany, GA
Contract #:
N69450-12-R-2263-0001
120204
A. West Project Manager:
Lavon Davis
Cost:
$1,955,079

Start Date:
November 1, 2012

End Date:
July 13, 2013

  • Project Description:
    The scope of this project consisted of replacing the 15kV duct bank system for circuits 30 and 40 at MCLB Albany, Georgia by installing 8300 ft. of duct bank, eight precast man holes, 15 pad-mount switches, 41,824 ft. of 15kV cable, 144 15kV terminations, and the removal of the existing 15kV system.