MCLB Circuit 20 West


Primary Contractor:
TEAM Construction, LLC
846 Bell Fork Road
Jacksonville, NC 28540
Owner: Marine Corp Logistics Base NAVFAC-MDLANT
Location: Albany, GA
Contract #:
ECM-N69450-08-D-1779-0009
AWE 120201

A. West Project Manager:
Jeremy Meads

Cost:
$4,278,166

Start Date:
September 28, 2011

End Date:
May 16, 2013

  • Project Description:
    The scope of this project consisted of a 15kV medium voltage distribution system including a new concrete encased duct bank, directional boring, primary cable, manholes, switch vaults, transformers, switches, sectionalizing cabinets, and cable splicing and testing.


Download Printable PDF