MCLB LAV and Clearspan


Primary Contractor:
Drace Construction
922 Porter Ave.
Suite 101
Ocean Springs, MS 39564
Owner: NAVFAC
Location: Albany, GA
Contract #:
ECM-N69450-13-D-1762-004
AWE 150105

A. West Project Manager:
Lavon Davis

Cost:
$254,038

Start Date:
May 1, 2015

End Date:
August 1, 2015

  • Project Description:
    The scope of this project consisted of installing the electrical scope of work for two clearspans at MCLB Albany. A total of 3,880 ft. of conduit, 11,610 ft. of wire and cable, 18 lights, and two panels were installed. A fire alarm and lightening protection via subs was also installed.