Shaw Arc Flash Correction


Primary Contractor:
A. West Enterprise
705 Canal Street
Albany, GA 31707
Owner: Shaw Industries
Location: Bainbridge, GA
Contract #:
No Contract #

A. West Project Manager:
Lavon Davis

Cost:
$225,186

Start Date:
May 1, 2015

End Date:
July 1, 2015

  • Project Description:
    The scope of this project consisted of setting a new amp motor control center, a 1600 amp two section switchboard, one 225 amp panel, and three 800 amp panels. All were provided by Shaw. A. West installed 3050 ft. of aluminum conduit ranging from 3/4 in. to 4 in and A. West pulled 15,160 ft. of cable ranging from #10 to 600 MCM. A. West removed an 800 amp MCC, 8 panels, two runs of bus duct and a unit substation. Shaw retained the bus duct and unit substation.