Cost:
$123,774

Start Date:
March 5, 2013

End Date:
August 27, 2013

  • Project Description:
    The scope of this project consisted of providing power to the new cationic blending system. Power was provided to twenty-four pieces of equipment in the warehouse, pump room, and blender platform. Feeds were swapped on two breakers in the warehouse substation. An 800 amp panel was replaced with a 1200 amp panel and the feeders were repulled. The electrical feed and data from the warehouse office were removed and reconnected once it had been relocated. Air to the six box tilters and water to the two dryers were provided. 3,350 ft. of aluminum rigid conduit was run and 14,230 ft. of wire was pulled.